Athlone Pharmaceuticals
216 Sqm Modular Building
The Task:
With time, cost and sustainability as major considerations, the management of Large Athlone Pharmaceutical Firm required a large scale Modular Building in 3 Weeks.
After consulting with our design team, Asset Accommodation were commissioned to provide a Modular Building to be used as a large scale meeting room complete with a toilet unit, tea station, & to construct a 7 metre link into the existing building.
Project Feature:
- 1 No. 216 Sqm Modular Building.
- 7 Metre Link from Existing Building To Modular Building.
- Complete Site Works for Unit.
- Supplied Furniture to turn it into a large scale Meeting Room.
The Solution:
Asset First poured Foundations for the unit to support the Modular Unit
And the linking unit to the existing building.
Asset Accommodation supplied the Aerie our “As New” Modular Building. Taking 7 days on site to have the unit completely installed & Formed a new link into the exiting building. We Also Supplied a full furniture set up for the meeting room.
The Asset Accommodation open-plan
layout and highlighted our efficiency to provide a Finish that created a bright
and spacious office environment that also helped to maintain
COVID – 19 guidelines.
The finished Units were fully fitted and equipped with the following:
- UPVC Double-Glazed Windows
- LED Lighting
- Fully Fitted Heaters & Airconditioning
- Carpet Floor Covering
- 13 Amp Double Sockets
- Tea Station fitted with worktop, sink unit, & Undersink water heater
- 2 No. W.C.’s, W.H.B.’s & Undersink Water Heater
Aerie Pharmaceuticals was very
impressed with the quality, design &
Structural Strength of the units and
appreciated Asset Accommodations
Efficiency, Design & Safety
When completing the modular building
on site.