C.A.B. Freight
New Transport Hub
The Task:
With C.A.B. Freight moving premises to a new site, they approached Asset Accommodation about providing a new office unit complete with a full set up for a transport hub
After consulting with our Design Team, The Contractor commissioned Asset Accommodation to provide a full site accommodation for a New transport Hub Facility
Project Feature:
- 2 No. New 40’ x 12’ Linked Units
- Double Insulated Walls
- Fully Fitted Data Rail
- Fully Fitted Kitchen
- No. Toilets
- Personal Office
- Meeting Room
- To Install a protected Barrier Under and between the units
- Another used Anti Vandal Unit for their Drivers Hub
The Solution:
Asset Accommodation supplied the contractor our New Standard Luxury Units Along A fully fitted kitchen, meeting room, large office, personal office, storage area & 2 No. Toilets. C.A.B. Freight also finished the unit y linking the 2 units together through the hallway & then placing a plywood trim under the units.
The Asset Accommodation bespoke layout and high Modern Finish created a bright and spacious office environment that also helped to maintain COVID – 19 guidelines.
The finished Units were fully equipped with the following:
- UPVC Double-Glazed Windows
- LED Lighting
- 1.5 Kw Panel Heaters
- Vinyl Floor Covering
- 13 Amp Double Sockets
- Network Sockets
- 85 mm insulated Walls
- Sound Proof Private Room
C.A.B. was very impressed with the quality, design &
Structural Strength of the units and appreciated
Asset Accommodations Efficiency, Safety & Professionalism of our workers on site when working with a highly reputable company. For the interior walkaround: please see https://www.youtube.com/watch?v=0mQIoyCgo30