St. Luke's Hospital
- Rathgar, Co. Dublin
- New 9.7 m x 3 m Cabin & 9.7 x 3 m Portable Shower & Toilet Cabins
- Project Duration: 4 Weeks
- Total SQM: 59 SQM
Project Feature:
- New 32’ x 10' Portable Changing Room Cabin
- New 32’ x 10' Portable Shower & Toilet Cabin
- High Grade Facilities
- Incorporaing different needs for different employees
- New 12' x 10' Portable Shower & Toilet Cabin
- Linked Together
The Solution:
The finished Units were fully equipped with the following:
• PVC High Level Double Glazed Windows
• Linked Together
• 1.5 Kw Panel Heaters
• Vinyl Wood Block Flooring Throughout
• 4 No. Female W.C.’s & Wash Hand Basins
• Vinyl Faced Finished Internally in Changing Room
• 2 No. Water Heaters with 2 No. Holding Tanks
• 6 No. Female Showers
• 2 No. Male W.C., Showers & Wash Hand Basin
St Lukes was very impressed with the quality, design & Structural Strength of the units and appreciated Asset Accommodations Efficiency, Safety & Professionalism of our workers on site when working with a highly reputable company.