Modular Buildings
Permanent Quality, Factory-Built Precision, Limitless Design.
The Best of Both Worlds:
Speed and Permanence.

Architectural Flexibility
Multi-story capability with vast internal spans. Easily customised with exterior finishes like brick slip, render, and timber to match existing architecture.

Exceptional Quality Control
Built in a climate-controlled factory environment, eliminating weather delays and guaranteeing precision engineering far superior to on-site methods.

Future-Proof Asset
Designed for a 50+ year structural lifespan, offering a superior return on investment compared to short-term solutions.

Sustainable Construction
Significantly reduced material waste and improved thermal performance (BÉRs) compared to conventional builds, supporting your green building goals.
Portable Cabins at a Glance
- Dimensions (Typical): Range from 3.6m x 2.4m up to 12m x 3.6m. (Smallest to Largest possible)
- Build Time (Typical): Ready-to-ship stock available.
- Custom build: 3–5 weeks.
- Warranty: 5 Year Structural Warranty.
- Lifespan 25+ Years (with maintenance).
Essential Space for Every Site.
- Construction Site Offices: Project management, contractor briefings, and administrative work.
- Welfare Facilities: Canteens, drying rooms, and changing areas that meet HSA requirements.
- Temporary Gate Houses: Security checkpoints and visitor reception areas.
Proven Performance
Mullingar Community College
Millmount Road, Mullingar, Co. Westmeath Total SQM: 845 Project Duration: 5 Months Two Storey Modular Building Project Feature: Building Energy...
Roscommon Community College
Ardanagh, Co. Roscommon Total SQM: 840 Project Duration: 5 Months Supported by Galway Roscommon Education & Training Board Project Feature:...
Inver College – Co. Monaghan
Carrickmacross, Co. Monaghan Total SQM: 825 Project Duration: 8 Months Project Feature: BER Rating: A Low Carbon in Operation Suspended...

















