Project Feature:

Project Info:

Alltec Fibres approached Asset Accommodation about a new portable office. After consulting with our design team, Asset Accommodation were commissioned to provide a Luxury Office to be used as a new limerick base for Alltec Fibres office staff.

Alltec Fibres – Limerick

Alltec Fibres Limerick Project Solution

Asset First poured Foundations for the unit to support the Unit with setting up a 2 section Portable Buildings. 

Asset Accommodation supplied the Alltec Fibres 7.2 metre x 12 Metre Luxury Portable office Cabin. Taking 2 days on site to have the groundworks completed and the Portable Cabin covered in completely installed. 

The Asset Accommodation open-plan
layout and highlighted our efficiency to provide a Finish that created a bright
and spacious office environment. with a separate entrance for use of toilets and a kitchenette.

The finished Units were fully fitted and equipped with the following:

  • UPVC Double-Glazed Windows
  • LED Lighting
  • Panel  Thermostat Controlled Heaters
  • Vinyl Floor Covering
  • 13 Amp Double Sockets & Data points
  • Worktop, Base Unit, sink, high press unit & Underisnk Water Heater
  • UPVC Fire Exit
  • UPVC Wheelchair Accessible Door
  • Large UPVC Windows
  • Anthricite Exterior
  • 2 No. Toilets & Wash Hand Basin
  • Large Link to offer a open plan space

We then Closed in all exposing areas with steel to give it a full modular building look, with alltec adding the few additions and steps to give the building a high finish.

Alltec Fibres approached Asset Accommodation about a new portable office. After consulting with our design team, Asset Accommodation were commissioned to provide a Luxury Office to be used as a new limerick base for Alltec Fibres office staff.